University of Tulsa: Lorton Performance Center

University of Tulsa

PHOTOS © HASTINGS+CHIVETTA ARCHITECTS, INC. / FENTRESS PHOTOGRAPHY

Hastings+Chivetta's Master Plan and study of the University of Tulsa’s current theatre building indicated that a new building was needed to provide additional space, improved functionality and state-of-the-art technology. The firm’s design for the resulting $28-million Performance Center contains 91,937 square feet of new construction and is sited at the edge of the Oklahoma campus for easy access by the public.

The major component of the Roxana Rozsa and Robert Eugene Lorton Performance Center is a 700-seat grand concert hall with a full 2,100-square-foot performance stage. The stage has a trap and large wings, as well as an orchestra pit, control booth and catwalks. A stretched fabric ceiling system with incorporated lighting gives the theater a unique finish. Support spaces include a green room, dressing rooms, scene shop, costume shop with laundry and storage, props room, lighting equipment and piano storage.

The lobby has a box office, coat check and art gallery. Other amenities include a catering kitchen with pantry, vending area and custodial storage.

A recital hall and various-sized rehearsal spaces are included for instrumental and vocal music, including a piano lab, percussion teaching studio and practice rooms, jazz band, music library, choral recording room and music technology computer lab. A film studio has production, scoring and editing capabilities.

Outside, a dramatic colonnade, featuring distinctive two-story Gothic arches, overlooks a sweeping front lawn.

The facility is the new home to the School of Music and the Film Studies Department, with each having their own office suite, classrooms and storage.

A student lounge and offices for student drama and music chapters are also included.

This article originally appeared in the issue of .

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.