Lancaster Bible College: Teague Learning Commons

Lancaster Bible College: Teague Learning Commons 

PHOTOS © NATHAN COX PHOTOGRAPHY

In early 2006, Lancaster Bible College (LBC) began to examine the needs of the campus library. Options ranged from renovations/additions to the existing facility to a totally new facility. The “library” project also evolved to a “student learning commons” which houses a library function.

LBC selected Cornerstone Design– Architects (CDA), who had designed numerous other facilities on the college’s Lancaster, PA, campus, for the project. CDA knew the client and their vision, and were well versed at a collaborative working relationship with Horst Construction, who would build the facility.

Part of that mission was to also include sustainable design practices in as much as it made sense economically, such as the 30 wells and geothermal heating and cooling system. Also, this was the first building that would occupy and set the tone for LBC’s north campus development.

The resulting 41,636-square-foot facility, which opened in August 2012, features the library housing more than 300,000 items, and also provides learning support services, an information literacy lab, a music composition lab, collaborative study rooms, a writing center, classrooms — and a popular spot at the front entrance, Bennee’s Bistro, with both indoor and outdoor seating.

Natural light and reflected sunlight at different parts of the day create a warm and hospitable internal environment and connection to the outdoor climate. Other than the mezzanine for the one level of library stacks, which has an open railing, other areas of the building are visually open but physically separated via floor-to-ceiling, one-half-inch-thick butt glazing.

We could review the technology support that the students now have available to them or recite further green inclusions and detail other design features, but suffice it to say, the new Teague Learning Commons has raised educational offerings to the student body and makes a significant contribution to LBC’s commitment to providing a quality education.

This article originally appeared in the issue of .

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition