New Jersey PreK–12 School Breaks Ground on New STEM Building

Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

The facility will measure in at 32,000 square feet and include amenities like 15 classrooms; four science labs; four small-group instruction rooms; and flex space for robotics, entrepreneurship, and engineering offerings. It will also include a commons area, admissions center, and student collaboration areas, the news release reports.

“We are honored to work with Saddle River Day School on this forward-thinking project,” said DIGroup Principal Jeffrey Venezia. “This facility’s architecture will provide students with modern, adaptable learning environments that cultivate scientific discovery, an entrepreneurial mindset and technology fluency, which is essential for educating tomorrow’s leaders.”

SRDS is a day school that serves students in grades PreK3–12, according to the school’s website. The construction of Walsh Hall is part of a larger “Building the Future” campaign, which also entails expanding parking and a new turf athletic field, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.