New Jersey PreK–12 School Breaks Ground on New STEM Building

Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

The facility will measure in at 32,000 square feet and include amenities like 15 classrooms; four science labs; four small-group instruction rooms; and flex space for robotics, entrepreneurship, and engineering offerings. It will also include a commons area, admissions center, and student collaboration areas, the news release reports.

“We are honored to work with Saddle River Day School on this forward-thinking project,” said DIGroup Principal Jeffrey Venezia. “This facility’s architecture will provide students with modern, adaptable learning environments that cultivate scientific discovery, an entrepreneurial mindset and technology fluency, which is essential for educating tomorrow’s leaders.”

SRDS is a day school that serves students in grades PreK3–12, according to the school’s website. The construction of Walsh Hall is part of a larger “Building the Future” campaign, which also entails expanding parking and a new turf athletic field, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.