Customized Shade System Reduces Costs

Lutron skylight shades 

Lutron’s skylight shades help Calvert High School make the most of natural daylight, saving energy and reducing costs in the process.

The beutiful, new addition to Calvert High School celebrates the sun, inviting daylight into virtually every corner of its multi-use media center. The addition features huge skylights, each more than 35 feet in length, pitched at a 16-degree angle.

Lutron meet-in-the-middle skylight shades help the school make the most of all the beneficial daylight in the space, while overcoming the design challenges. The Lutron system offers five preset configurations that can be quickly recalled at the touch of a button, allowing the right amount of daylight into the space for any situation or activity. The skylights in Calvert High School are not only 35 feet in length, they are also 31 to 41 feet above the floor, span 17,000 square feet, are steeply pitched and provide limited space for shades.

The Lutron meet-in-the-middle shade system was custom-designed to fit into the assembly, which accommodates four independent components: the skylight structure itself, sprinkler piping, sprinkler enclosure and the shade frames. Avitecture, Inc. in Sterling, Va., installed all components, assisted in the design of the systems and worked with Lutron engineers throughout the entire process to successfully complete the design and installation of this challenging project. The result is dramatic in its subtlety.

One of greatest benefits of the school’s shades installation comes in the form of energy savings. The Lutron meet-in-the-middle skylight shades allow for varying openness levels to control heat and reduce operating costs. In the closed position the shades increase space flexibility, enabling the space to be used as a media center and projection facility at any time during the day.

Bill Coutz, manager of shading and lighting at Avitecture, summarizes the effect of the completed installation. “To see the system work on a day-to-day basis and to meet the objectives that were originally defined by the architects — that is total satisfaction.”

This article originally appeared in the issue of .

Featured

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition