Customized Shade System Reduces Costs

Lutron skylight shades 

Lutron’s skylight shades help Calvert High School make the most of natural daylight, saving energy and reducing costs in the process.

The beutiful, new addition to Calvert High School celebrates the sun, inviting daylight into virtually every corner of its multi-use media center. The addition features huge skylights, each more than 35 feet in length, pitched at a 16-degree angle.

Lutron meet-in-the-middle skylight shades help the school make the most of all the beneficial daylight in the space, while overcoming the design challenges. The Lutron system offers five preset configurations that can be quickly recalled at the touch of a button, allowing the right amount of daylight into the space for any situation or activity. The skylights in Calvert High School are not only 35 feet in length, they are also 31 to 41 feet above the floor, span 17,000 square feet, are steeply pitched and provide limited space for shades.

The Lutron meet-in-the-middle shade system was custom-designed to fit into the assembly, which accommodates four independent components: the skylight structure itself, sprinkler piping, sprinkler enclosure and the shade frames. Avitecture, Inc. in Sterling, Va., installed all components, assisted in the design of the systems and worked with Lutron engineers throughout the entire process to successfully complete the design and installation of this challenging project. The result is dramatic in its subtlety.

One of greatest benefits of the school’s shades installation comes in the form of energy savings. The Lutron meet-in-the-middle skylight shades allow for varying openness levels to control heat and reduce operating costs. In the closed position the shades increase space flexibility, enabling the space to be used as a media center and projection facility at any time during the day.

Bill Coutz, manager of shading and lighting at Avitecture, summarizes the effect of the completed installation. “To see the system work on a day-to-day basis and to meet the objectives that were originally defined by the architects — that is total satisfaction.”

This article originally appeared in the issue of .

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.