Process Cleaning for Healthy Schools (PC4HS) Provides Guidance on Handling Potential PCB-containing Dust

Sparks NV − The 501c3 Process Cleaning for Healthy Schools® (PC4HS) group is providing guidance on handling potential PCB-containing dust from substances such as older caulking in schools.

According to the US EPA: “Caulk containing potentially harmful polychlorinated biphenyls (PCBs) was used in many buildings, including schools, in the 1950s through the 1970s. Most schools and buildings built after 1979 do not contain PCBs in caulk. On September 25, 2009, EPA announced new guidance for school administrators and building managers with important information about managing PCBs in caulk and tools to help minimize possible exposure. Through EPA PCB Regional Coordinators, the Agency will also assist communities in identifying potential problems and, if necessary, developing plans for PCB testing and removal.”

PC4HS recommends that schools take two initial steps when caulk or other materials are suspected of containing PCBs:

1. Test first (a non-custodial role). Per EPA: “If testing reveals PCB levels above the levels EPA has determined to be safe, schools should attempt to identify any potential sources of PCBs that may be present in the building, including testing samples of caulk and looking for other potential PCB sources (e.g., old transformers, capacitors, or fluorescent light ballasts that might still be present at the school).

2. If elevated PCB content is found, proceed with EPA Guidance – See www.epa.gov/epawaste/hazard/tsd/pcbs/index.htm  and www.epa.gov/pcbsincaulk/

General PC4HS IAQ Guidance
Dust – potentially containing PCBs and other unwanted matter – should always be considered a “hazardous” substance, and be safely contained and removed from buildings rather than stirred into the air. PC4HS recommends high-efficiency containment and removal methods including:

  • Well-filtered vacuums certified for Indoor Air Quality (IAQ) by Carpet and Rug Institute (CRI) testing, and/or other independent labs.
  • Emptying and cleaning/inspecting vacuum filters regularly to avoid overloading and torn or compromised media; and to help ensure optimal safety and performance.
  • Emptying vacuum liners or bags outdoors and into a plastic trash liner to avoid spreading particles.
  • Damp cloth or microfiber dusters that capture and remove particulates. These materials should be laundered separately from other textiles.
  • Frequent dusting (e.g., in classrooms) utilizing cleaning specialists in a mapped and inspected process or plan that enables regular and thorough removal of soils (including dust).
  • Good ventilation to minimize airborne particles that may be harmful or allergenic.

The definition and identification of dust that is “potentially hazardous” has become broader as health science has advanced, since pollutants in even tiny amounts (parts per billion) are known to affect human hormonal systems; these are known as “endocrine disrupters.” Therefore, PC4HS follows the “precautionary principle” of avoidance and adheres to EPA information that advises a three-stage strategy to protect IAQ:

  1. Source removal or capture
  2. Ventilation
  3. Air cleaning (in partnership with HVAC departments)

The number one way, source removal or capture, is standard procedure for PC4HS crews. In addition, PC4HS is looking at ways to monitor and track airborne levels of dust (Reference: Dylos -- www.dylosproducts.com) and sample dust for allergens (Ref: Inbio -- www.inbio.com). See also www.pc4hf.com.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.