EPA Releases Guidance to Improve Schools' Indoor Air Quality and Energy Efficiency

On Oct. 17, the U.S. Environmental Protection Agency (EPA) released new guidance to help school districts protect indoor air quality while increasing energy efficiency during school renovations.

“This guidance provides common-sense solutions for improving energy efficiency and indoor air quality in schools across the country,” says Janet McCabe, acting assistant administrator for EPA’s Office of Air and Radiation. “By using these guidelines, school districts can cut their energy bills and help ensure that students have a healthy and safe learning environment.”

Both energy management and protection of indoor air quality (IAQ) are important considerations for school facility management during energy upgrades and retrofits, and schools can protect occupant health by addressing both goals holistically. These renovation and construction activities can create dust, introduce new contaminants and contaminant pathways, create or aggravate moisture problems, and result in inadequate ventilation in occupied spaces. EPA’s “Energy Savings Plus Health: Indoor Air Quality Guidelines for School Building Upgrades” offers opportunities to prevent and control potentially harmful conditions during school renovations.

The practices outlined in the new guidance support schools as healthy, energy-efficient buildings that play a significant role in local communities. Nearly 55 million elementary and secondary students occupy our schools, as well as 7 million teachers, faculty and staff. In addition, many communities use school buildings after regular school hours as after-care facilities, recreation centers, meeting places and emergency shelters during natural disasters.

For more than a decade, EPA has made significant strides in protecting children’s health in schools by equipping personnel at the state, district and school level with the necessary knowledge and tools to create healthy indoor environments. The new guidance builds on EPA’s existing programs, such as ENERGY STAR for schools and “Indoor Air Quality Tools for Schools,” which helps schools identify, resolve and prevent air quality problems, often with low- and no-cost measures.

Today, half of the schools in the United States have adopted indoor air quality management plans, the majority of which are based on EPA’s IAQ Tools for Schools. However, there are still about 25 million children in nearly 60,000 schools who are not yet protected by IAQ management programs.

Visit www.epa.gov to download the new guidance and www.epa.gov/schools for other valuable school environmental health resources.

This article originally appeared in the issue of .

Featured

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition