New Vents Solve Old Problems

Spirovents

Spirovents helped solve many of the heating problems experienced by Carman Hall, the “problem child” of facilities at Eastern Illinois University.

After having tried numerous other methods, the first Spirovent was installed in Carman Hall at Eastern Illinois University (EIU) in Charleston, to deal with a long history of no heat calls and clogging valves. The very next season resulted in almost no calls or valve issues in this two-pipe high-rise residence hall. Since then, almost all residence halls have Spirovents installed as well as academic buildings and the central loop.

Carman Hall was considered the “problem child” by the campus maintenance staff. The students residing in the 30-year-old twin-tower high rise in the far southeast corner of the campus averaged two to three calls per day complaining about the lack of heat. The record, though, was more than 25 calls in one weekend. Carman Hall is heated using a two-pipe system that takes steam from the central plant and converts it to hot water.

The Spirovent, made by Spirotherm, Inc. employs the patented Spirotube® coalescing/barrier medium to scrub air and dirt from hot and chilled water systems with unprecedented efficiency. The air is released from the top of the unit via a patented air release mechanism, while the dirt falls to the bottom and collects in the dirt chamber where it can be blown down through a manual or automatic blow-down valve.

Because Spirovent units are so simple to install, there was no reason to hire a contractor, and the maintenance staff did the installation. EIU states that there has been a definite improvement in system performance since the Spirovent was installed.

The valve clogging problems have been virtually eliminated and the no-heat calls have all but disappeared. Rick Bagwell, the environmental control foreman at the time, remarks, “I’m very happy with the Spirovents and what they can do. I was skeptical at first because we’ve tried many things and none of them worked. Spirovents are the first that did.”

www.spirotherm.com

This article originally appeared in the issue of .

Featured

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.