University of Cincinnati: Sheakley Athletics Center

Sheakley Athletics Center

PHOTOS © JOE HARRISON, JH PHOTOGRAPHY INC.

For the University of Cincinnati’s (UC) Intercollegiate Athletics program to remain competitive in the field and classroom, recruit the best athletes/coaching staff and position itself for athletic conference realignment, it needed an additional on-campus training facility. The challenge for this land-locked urban university was to think “outside the box” when developing a new outdoor practice facility large enough to provide adequate space for both outdoor and indoor training.

The complex, designed by MSA Sport (a division of MSA Architects, with offices in Cincinnati and Columbus, OH) includes a full-regulation field, a half practice field, team meeting rooms, press/coaches box, filming tower and fan amenities. From March through November the complex is a football practice facility and a women’s lacrosse competition stadium with full spectator functions and 1,000 seats. During the off-season, an inflatable dome, aka “the bubble,” is installed, allowing for year-round use.

This combination of an outdoor “gameready” facility and indoor “all-purpose” facility is unprecedented in the Midwest for an NCAA Division 1 university. The resulting complex not only benefits the football and lacrosse programs, but also the entire student-athlete population, allowing them easy access to the complex from the UC’s Varsity Village.

While athletics played a significant role in program development, overall integration into the Master Plan and academic goals of the university was essential, including:

  • Providing a “first class” venue to allow athletes to train, compete and succeed at the highest level while being close to the heart of the academic and residence-life heart of campus.
  • Rigid competition facility dimension specifications.
  • Full vehicle and pedestrian access that can be closed during practices and games for maximum efficiency.
  • Integration of public spaces, campus and urban framework around the facility edges.
  • A 60-foot topographic elevation change.
  • Incorporating a 5,000,000-gallon chilled water storage tank under the half practice field, thereby saving UC $1 million per year in utility costs.

This article originally appeared in the issue of .

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.