University of Cincinnati: Sheakley Athletics Center

Sheakley Athletics Center

PHOTOS © JOE HARRISON, JH PHOTOGRAPHY INC.

For the University of Cincinnati’s (UC) Intercollegiate Athletics program to remain competitive in the field and classroom, recruit the best athletes/coaching staff and position itself for athletic conference realignment, it needed an additional on-campus training facility. The challenge for this land-locked urban university was to think “outside the box” when developing a new outdoor practice facility large enough to provide adequate space for both outdoor and indoor training.

The complex, designed by MSA Sport (a division of MSA Architects, with offices in Cincinnati and Columbus, OH) includes a full-regulation field, a half practice field, team meeting rooms, press/coaches box, filming tower and fan amenities. From March through November the complex is a football practice facility and a women’s lacrosse competition stadium with full spectator functions and 1,000 seats. During the off-season, an inflatable dome, aka “the bubble,” is installed, allowing for year-round use.

This combination of an outdoor “gameready” facility and indoor “all-purpose” facility is unprecedented in the Midwest for an NCAA Division 1 university. The resulting complex not only benefits the football and lacrosse programs, but also the entire student-athlete population, allowing them easy access to the complex from the UC’s Varsity Village.

While athletics played a significant role in program development, overall integration into the Master Plan and academic goals of the university was essential, including:

  • Providing a “first class” venue to allow athletes to train, compete and succeed at the highest level while being close to the heart of the academic and residence-life heart of campus.
  • Rigid competition facility dimension specifications.
  • Full vehicle and pedestrian access that can be closed during practices and games for maximum efficiency.
  • Integration of public spaces, campus and urban framework around the facility edges.
  • A 60-foot topographic elevation change.
  • Incorporating a 5,000,000-gallon chilled water storage tank under the half practice field, thereby saving UC $1 million per year in utility costs.

This article originally appeared in the issue of .

Featured

  • MiEN Releases White Paper on Community College Space Innovation

    MiEN Company recently released a new white paper called “Designing New Innovative Spaces for Community Colleges” to address the needs of community colleges post-pandemic, according to a news release. The eight-page guide by Dr. Christina Counts, MiEN Company VP of Education and Marketing, covers topics like the enrollment drop that these schools have seen since COVID-19, the roles they play in higher education and local workforces, and five suggested key changes that can improve students’ experiences.

  • Image courtesy of Armstrong International

    The Modern Hot Water System Approach to Keep Higher Education Buildings Safe and Operational

    Higher education campuses face unique structural and operational demands. With a range of old and new buildings, a variety of facility types, and ambitious sustainability goals, it's essential that no aspect of infrastructural performance is overlooked. Facility managers must be equipped to provide a safe, reliable and efficient space for students, faculty and guests.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

Digital Edition