New Washfountain Makes A Splash

washfountain

The new washfountain at Madison Elementary takes up less space, and is much easier to clean than the school’s previous antique model.

Madison Elementary, part of the West Allis-West Milwaukee School District, has more than 230 students enrolled in classes ranging from kindergarten to sixth grade. As with many older schools, Madison could use a few facility upgrades, particularly with regard to classroom hand washing areas.

After decades of use, a washfountain in Madison Elementary’s kindergarten classroom was wearing out and desperately needed to be replaced. “Most of the spray holes were permanently clogged, so the water would shoot out of the others and over the edge of the washfountain making a big mess,” says school custodian, Bill Ziolecki.

“Maintenance had become a big challenge on the old washfountain,” adds Ziolecki. “It was also a bear to clean, and frankly, the bowl material looked better if we left it alone.”

As part of an 80th Anniversary celebration, Bradley Corp. held a search for the “Ultimate Washfountain” to find the most unique, antique, or otherwise unusual washfountains. After judging the entries, visitors to Bradley’s website chose Madison Elementary as one of the ultimate winners. Most likely, Madison was selected because their washfountain was extremely old, and a new washfountain would benefit kindergarten and first grade students.

In early 2003, Madison Elementary received their grand prize, a new Bradley Terreon Classic Juvenile Height Washfountain. Juvenile-height washfountains accommodate at least three users — a feature that conserves water and energy and takes up less space than restrooms or classes equipped with conventional sinks.

“The new Bradley washfountain is much easier to keep clean,” Ziolecki says. “I’d like to get washfountains throughout the entire school. The children really have fun using them.”

www.bradleycorp.com

This article originally appeared in the issue of .

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition