Managing Delays From the Construction Side

Not all construction delays are the fault of the construction contractor. By keeping the lines of communications open, the client and contractor together can work to avoid any serious slowdowns in the project.

Project managers should be aware of early warning of delays caused by the client, main contractor or your own people. Client delays arise because they may change their minds, give instructions too late or are slow in approving drawings and plans. They tend to overlook the fact that these delays push back the start for contractors or sub-contractors, and that the contractor is powerless to avoid these delays.

Main contractor delays usually involve construction work being completed late, causing subsequent stages to fall behind schedule. In some cases, delays are the result of mismanagement and a lack of coordination.

Last but not least, the subcontractors themselves may cause delays; for example, by under-resourcing the project in the early stages or by not completing design drawings and getting them approved on time.

Make sure delays outside your control are recognized and documented. Such delays can impact you financially and need to be recorded and the financial impact dealt with by the responsible party. You should not have to bear the cost of other peoples’ delays, nor should you be blamed for them.

This article originally appeared in the issue of .

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Brightly Software, XOi Partner for New HVAC Data Solution

    Siemens company Brightly Software recently announced a partnership with data intelligence company XOi to integrate real-time HVAC system data into Brightly’s Asset Essentials CMMS, according to a news release. The integration will allow facilities more insight into HVAC system performance, health, and risk across their operations.

Digital Edition