Can TDDs impact funding?

As more states move from enrollment to performance-based funding systems, colleges and universities need to find ways to fuel student achievement.

Numerous studies have shown that daylight in classrooms plays an important role in student performance. Its natural brightness, variability and perfect color rendition help students stay alert, work more productively and perform better.

Yet unlike conventional daylighting options (e.g., windows and skylights), tubular daylighting devices (TDDs) deliver natural light without solar heat gain. The result is a brightly lit, comfortable learning environment that allows students and instructors to excel.

When looking for systems that bring in the most light with the least amount of heat, the light-to-solar-heat gain (LSG) ratio is a key metric. It quantifies the amount of usable light to solar heat transmitted into a space. The higher the LSG ratio, the better. A high-performing fenestration system will have an LSG ratio between 1.0 to 1.5, although recent technological advancements have resulted in breakthrough ratios of 3.0 and higher for TDDs.

Innovations prompting this include patented and proprietary daylight-collection domes, lenses and reflectors that maximize light capture and reject heat at the rooftop. Reflective tubing with integrated heat-filtering (cooling) properties further increases performance by transferring large amounts of daylight while minimizing heat gain.

Systems with daylight collectors raise the LSG ratio even higher because they capture natural light that typically bypasses the daylight collection system. In such instances, previously unattainable values nearing 5.0 are possible.

With TDDs, higher education facilities now have a viable solution that promotes student achievement and offers an advantage when it comes to performance funding.

This article originally appeared in the issue of .

About the Author

Neall Digert, Ph.D., MIES, is vice president of Product Enterprise for Solatube International, Inc., Vista, CA (www.solatube.com).

Featured

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • UNH Marks Construction Milestone on Oceanic Exploration Facility

    The University of New Hampshire in Durham, N.H., recently celebrated a major construction milestone with a beam-signing ceremony for the new Center of Excellence for Operational Ocean and Great Lakes Mapping, according to a news release. The facility’s ultimate goal is to support research, training and technical assistance in ocean mapping.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.