Can TDDs impact funding?

As more states move from enrollment to performance-based funding systems, colleges and universities need to find ways to fuel student achievement.

Numerous studies have shown that daylight in classrooms plays an important role in student performance. Its natural brightness, variability and perfect color rendition help students stay alert, work more productively and perform better.

Yet unlike conventional daylighting options (e.g., windows and skylights), tubular daylighting devices (TDDs) deliver natural light without solar heat gain. The result is a brightly lit, comfortable learning environment that allows students and instructors to excel.

When looking for systems that bring in the most light with the least amount of heat, the light-to-solar-heat gain (LSG) ratio is a key metric. It quantifies the amount of usable light to solar heat transmitted into a space. The higher the LSG ratio, the better. A high-performing fenestration system will have an LSG ratio between 1.0 to 1.5, although recent technological advancements have resulted in breakthrough ratios of 3.0 and higher for TDDs.

Innovations prompting this include patented and proprietary daylight-collection domes, lenses and reflectors that maximize light capture and reject heat at the rooftop. Reflective tubing with integrated heat-filtering (cooling) properties further increases performance by transferring large amounts of daylight while minimizing heat gain.

Systems with daylight collectors raise the LSG ratio even higher because they capture natural light that typically bypasses the daylight collection system. In such instances, previously unattainable values nearing 5.0 are possible.

With TDDs, higher education facilities now have a viable solution that promotes student achievement and offers an advantage when it comes to performance funding.

This article originally appeared in the issue of .

About the Author

Neall Digert, Ph.D., MIES, is vice president of Product Enterprise for Solatube International, Inc., Vista, CA (www.solatube.com).

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition