How to Select a Green Door

Many studies have shown that improved energy efficiency is the top driver behind sustainable design across all industries. The improvement of heating and cooling efficiency is the single most important attribute of the LEED standard, with efficiency thresholds being raised with each subsequent version of the standard. It is also the metric with the most obvious return on investment.

Although only a small portion of a structure’s surface area, exterior doors and frames are a functional part of the building envelope and can play an important role in the overall energy efficiency of a building. As with windows or walls, care should be taken to specify components that limit thermal exchange (the transfer of heat from one side of the door and frame to the other).

Improving the thermal performance of your building envelope helps reduce energy usage and energy costs. You can help reduce heating and cooling loads by providing superior thermal performance windows and exterior entrances (doors and framing systems). Some aspects for accomplishing this:

  • Properly sealed construction
  • Resistance to thermal extremes
  • Superior insulation
  • Thermally broken framing
  • Insulated panels in adjoining sidelites
  • Insulated glass of at least one-inch thickness
  • Keep vision lites to a minimum

Don’t be fooled by claims that equate the performance of the core material alone with the performance of a complete door assembly, because they are not the same thing. Of any entrance system performance metric, thermal performance has the most easily represented, verifiable and measurable values. Without getting into technical details, remember: the U-Value of a product should be low, while the R-value should be high.

This article originally appeared in the issue of .

About the Author

Barbara Jo Serago is a sales manager, Strategic Initiative, for Special-Lite, Inc. (www.special-lite.com).

Featured

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.