Preventing Moisture-Related Flooring Issues

Concrete slabs are the most common flooring base used in a range of buildings, including schools. Unfortunately, excessive moisture found in concrete slabs prior to a flooring installation can cause significant floor-covering system failures such as debonding of coatings, microbial growth and flooring expansion.

There are several steps that can be taken to mitigate and potentially prevent moisture issues before a floor covering is installed. These apply to either new or remodel projects.

The first step is to conduct moisture testing. Substrate surfaces must be tested for moisture emission prior to starting the installation. Most manufacturers and flooring installation contractors recommend relative humidity probe moisture testing, as the results of this type of test are typically more accurate, reliable and consistent than other testing methods.

If moisture emission is discovered then proper precautions, such as the use of several topical applications prior to the flooring installation, can be used for moisture mitigation. Some of these topical applications include using reactive penetrants and moisture-retarding coatings.

Finally, consider selecting a floor covering that has a higher tolerance for moisture and can perform on concrete slabs with elevated relative humidity levels. Some flooring options, such as textile composite flooring, perform in areas with elevated moisture. The breathable nature of these flooring products allows moisture to pass through the backing rather than trap it underneath. This method of vapor transmission enables the flooring to be installed with no moisture mitigation as long as the relative humidity test reads 95 percent or below.

Taking these steps prior to installation can save money and mitigate potential flooring system failures.

This article originally appeared in the issue of .

About the Author

David Daughtrey is the director of business development for education with J+J Flooring Group.

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.