2017 Education Budget Request

On February 9, 2016 President Obama released his Fiscal Year 2017 Budget. The President's budget request for FY 2017 includes $69.4 billion in discretionary funding, an increase of a 2 percent ($1.3 billion) over the 2016 appropriation.  The focus of the 2017 Budget includes increasing equity and excellence; providing support for teachers and school leaders; expanding access, affordability, and completion in higher education.

The budget supports the implementation of the Every Student Succeeds Act (ESSA) signed by President Obama on December 10, 2015. This bipartisan measure reauthorizes the 50-year-old Elementary and Secondary Education Act (ESEA), and replaces the No Child Left Behind (NCLB) Act, the previous version of the law that was enacted in 2002.

Details of the budget proposal include:

More information on the Department of Education's budget request can be found at www.ed.gov/budget.

Featured

  • Image courtesy of Armstrong International

    The Modern Hot Water System Approach to Keep Higher Education Buildings Safe and Operational

    Higher education campuses face unique structural and operational demands. With a range of old and new buildings, a variety of facility types, and ambitious sustainability goals, it's essential that no aspect of infrastructural performance is overlooked. Facility managers must be equipped to provide a safe, reliable and efficient space for students, faculty and guests.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

Digital Edition