University of Massachusetts Boston: Integrated Sciences Complex

University of Massachusetts Boston: Integrated Sciences Complex

PHOTOS © ROBERT BENSON PHOTOGRAPHY

The Integrated Sciences Complex (ISC) opened on the University of Massachusetts Boston’s campus in the spring of 2015. The building has an immediate welcoming impact upon entering the campus.

The 220,000-square-foot building features research labs and support space for biology, chemistry, environmental science, physics and psychology; undergraduate introductory biology teaching laboratories; an interdisciplinary undergraduate sandbox teaching lab; infant cognition lab; and a new research center — the Center for Personalized Cancer Therapy.

The layout throughout the building fosters collaboration among both students and faculty across disciplines. The clustering of social spaces such as stairs, elevators, meetings rooms and offices combined with the strategic placement of departments and their shared facilities encourages interaction between individuals and academic groups. The biology teaching labs and sandbox project lab are aligned vertically on the first and second floors with windows to the lobby and open stairway to demonstrate “science on display.”

The multistory front glass enclosure creates an atrium streaming with sunlight. Oval-shaped lights, which constantly change colors, hang in groupings of two to five, facing in the same direction, simulating schools of fish.

The exterior design contrasts with existing campus buildings, which are principally brick. Its lighter color, hinting at that of beach sand as it sits on the water’s edge, is analogous to the Campus Center, which opened in the spring of 2004. The design is meant to reduce heat absorption and be more energy efficient, earning it LEED Silver-certified designation.

The building was designed by Boston-based architectural firm Goody Clancy and built by Walsh Brothers. The new facility is part of UMass Boston’s 25-year Master Plan, which is the physical realization of the university’s strategic vision: becoming a model, student-centered, urban public research university.

This article originally appeared in the issue of .

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.