University of Massachusetts Boston: Integrated Sciences Complex

University of Massachusetts Boston: Integrated Sciences Complex

PHOTOS © ROBERT BENSON PHOTOGRAPHY

The Integrated Sciences Complex (ISC) opened on the University of Massachusetts Boston’s campus in the spring of 2015. The building has an immediate welcoming impact upon entering the campus.

The 220,000-square-foot building features research labs and support space for biology, chemistry, environmental science, physics and psychology; undergraduate introductory biology teaching laboratories; an interdisciplinary undergraduate sandbox teaching lab; infant cognition lab; and a new research center — the Center for Personalized Cancer Therapy.

The layout throughout the building fosters collaboration among both students and faculty across disciplines. The clustering of social spaces such as stairs, elevators, meetings rooms and offices combined with the strategic placement of departments and their shared facilities encourages interaction between individuals and academic groups. The biology teaching labs and sandbox project lab are aligned vertically on the first and second floors with windows to the lobby and open stairway to demonstrate “science on display.”

The multistory front glass enclosure creates an atrium streaming with sunlight. Oval-shaped lights, which constantly change colors, hang in groupings of two to five, facing in the same direction, simulating schools of fish.

The exterior design contrasts with existing campus buildings, which are principally brick. Its lighter color, hinting at that of beach sand as it sits on the water’s edge, is analogous to the Campus Center, which opened in the spring of 2004. The design is meant to reduce heat absorption and be more energy efficient, earning it LEED Silver-certified designation.

The building was designed by Boston-based architectural firm Goody Clancy and built by Walsh Brothers. The new facility is part of UMass Boston’s 25-year Master Plan, which is the physical realization of the university’s strategic vision: becoming a model, student-centered, urban public research university.

This article originally appeared in the issue of .

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • KI Launches K–12 Classroom Furniture Giveaway

    Contract furniture company KI recently announced the launch of its fourth-annual Classroom Furniture Giveaway, which awards $50,000 each to four K–12 educators across the U.S., according to a news release. The goal is to address decreasing student engagement and increasing teacher burnout numbers by updating learning spaces to accommodate modern needs.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

Digital Edition