Fitchburg State University

Project Snapshot

PROJECT: Integrating Technology
INSTITUTION: Fitchburg State University
LOCATION: Fitchburg, MA
COMPANY NAME: Connectrac
WEBSITE: www.connectrac.com

Fitchburg State University

A large renovation was made easier at Fitchburg State University, thanks to the versatility of Connectrac’s In-Carpet wireways.

THE CHALLENGE

Described as the “living room of the university,” Hammond Hall is Fitchburg State University’s central student hub. Being such a focal point of the campus, Fitchburg State assigned the team at Annese Electric — an electrical contractor based in Weymouth, MA — to install power and data connectivity and cable management throughout the entire library. The university hoped to provide technological access to students from as many places as possible. In preparation of the project, Annese researched for a product that could affordably accomplish this goal without intruding on student activities and that also had the flexibility to be relocated in case of future renovations inside the library. With multiple options presented to them, the team at Annese selected Connectrac Wireways.

“It was easy to install everywhere,” recalls Annese Electrical Foreman John Hughes. “Connectrac gave us the flexibility to give power and data anywhere without core drilling or saw cutting and spending a bunch of money.”

Hughes and his team ran into one specific challenge during their installation. In an upper floor in Hammond Hall lies a study and lounge area with chairs and work stations placed along a large glass window looking out to the campus. Being a popular spot in the library, Fitchburg State wanted to provide connectivity along the window railing. Hughes and his team put down Connectrac’s In-Carpet wireway with ease, bringing the carpet all the way up to the window for a near-invisible aesthetic.

Fitchburg State University

THE SOLUTION

“The transition ramps worked out well. The carpet came up and finished it to give it a nice look,” Hughes recalls. “It worked out really well because one half butted against the window. It went down extremely easy and had the flexibility to let us do whatever we wanted.”

IMPACT ON LEARNING

Annese Electric pulled off the multi-stage project seamlessly, bringing connectivity and cable management to the entirety of Hammond Hall. The process went so smoothly that Annese brought in Connectrac for another phase in the Hammond Hall project, renovating multiple floors for more connectivity and cable management.

“It was a huge project that had a lot of variables that came with it,” says Connectrac Director of Sales Steve Batchelder. “With such a large renovation, you hope the products you rely on can pull through for you without any added stress, and we’re happy Connectrac’s flexibility worked well for the job Annese Electric put together.”

Editor’s Review

Throughout the past 10 years, research has shown that technology can enhance literacy development, provide greater access to information, support learning, motivate students and enhance their self-esteem… and obviously, today’s students have grown up with technology at their fingertips and expect it to be integrated into their learning spaces. This technology integration project at Fitchburg State took into account schedule, budget and technology, and ultimately provided a low-impact interruption to operations that has resulted in a much-improved space for student study and learning.

This article originally appeared in the issue of .

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition