St. Elizabeth Ann Seton School

Project Snapshot

PROJECT: St. Elizabeth Ann Seton School
LOCATION: Keller, Texas
COMPANY NAME: Stonhard
WEBSITE: www.stonhard.com

St. Elizabeth Ann Seton School

Colors and geometrical patterns guide students through hallways and corridors while providing a bright and inspiring environment.

THE CHALLENGE

The design decision makers at St. Elizabeth Ann Seton School, in Keller, Texas, set out to complete corridor and restroom floors to meet the needs of their school. The criterion was wear-resistant floors that would stand up to continuous foot and cart traffic while reducing noise. They also required floors that are easy to keep clean and safe, even when slippery. Finally, this-forward thinking school wanted design and color integrated into the overall décor.

THE SOLUTION

Terrazzo flooring was originally specified for the job, until a strong recommendation from a general contractor changed the minds at St. Elizabeth’s. The general contractor had recently worked with Stonhard’s commercial product line and he endorsed Stonhard based on his experience on a construction management level as well as the quality of the products. They presented the school with an option to traditional terrazzo, Stonres RTZ, a seamless, urethane system infused with rubber aggregate chips. This system provides exceptional acoustic efficiency and ergonomic comfort while providing a superior wear and stain resistant floor.

It is also offered in the colors and dynamic design scheme the school was seeking. Multi-colored aggregate in a high-performance matrix allows Stonhard to create intricate patterns and incorporate geometric shapes in an endless palette of colors. The use of a unique rubber aggregate produces much quieter floors and eliminates echoes and reverberation.

St. Elizabeth Ann Seton School

The installation of the Stonhard floors in the school’s new wing was done in November of 2004. The floor was ready for foot traffic after only 12 hours, and within 48 hours it was available for full service.

IMPACT ON LEARNING

Towards the completion of the installation, a teacher stopped the Stonhard Project Manager to let him know the floors had changed how both teachers and students felt about their building. She said, “The floors really make a difference.” The floors at St. Elizabeth Ann Seton motivate staff, students and parents with bright, bold colors and patterns and have helped to fuel an environment that is educational and imaginative. With its new flooring, the school has become a place where creativity is encouraged with colorful and durable floors that require minimum maintenance. The projects initial goals, student comfort and safety, have been met and surpassed thanks to the flooring choices.

Editor’s Review

We have learned that our most successful schools provide a welcoming atmosphere. We also know that color impacts student achievement, as well as teacher effectiveness and staff efficiency. Research has demonstrated that specific colors influence the health, morale, emotions, behavior and the performance of learners. When you apply that to school flooring, and couple that with longevity and safety factors, the result is definitely going to have a positive influence on a student’s ability to learn and the school’s ability to use more of its resources for hands-on educational expenses.

This article originally appeared in the issue of .

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

Digital Edition