Free E-Guide on Restroom Budget Control

SHARONVILLE, OH – The consumption of hand soap has increased in the past few years as the emphasis on hand washing to fight germs that can cause illness has boosted the public’s awareness of proper hand hygiene. At the same time, facility managers are pressured to control their budgets. Since hand soap is one of the largest consumable line items in a restroom maintenance budget, Kutol Products Company has crunched the numbers and offers this free Restroom Budget Control E-Guide: How Foaming Hand Soap Saves Product Costs.

Included in this E-Guide are a number of comparisons between traditional liquid hand soap and foam hand soap including usage per hand wash, cost per hand wash, and how many hand washes a 1000 mL refill will provide.

“In an effort to control costs, it is easy to make a simple switch in hand soap and realize significant savings,” points out Dan Renner, director of marketing for Kutol Products Company. “However, many facility managers are not aware how much this simple change can benefit their bottom line. This E-Guide clearly highlights the product use and cost differences between liquid hand soap and foam hand soap, no matter what brand is being used.”

The E-Guide also provides a detailed breakdown of savings when considering various building capacities and user traffic.  As an example, a high school with a student body of 1,000 can save over $2,100 in just one school year by switching from liquid hand soap to foaming hand soap. For a school district of 10,000 students, those savings can add up to over $21,000!

The Restroom Budget Control E-Guide: How Foaming Hand Soap Saves Product Costs is available as a free download at www.Kutol.com under “Tools & Resources/White Papers & E-Guides.”

About Kutol Products Company
KUTOL Products Company, founded in 1912, is a manufacturer of commercial hand soaps, hand sanitizers and soap dispensing systems. Visit www.Kutol.com for more information.

Featured

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.