Entrance Flooring Systems

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Your entrance is where the first line of defense should start for trapping dirt and water.

The flooring product industry has changed significantly and will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slips, trips and falls while providing exceptional defense for managing dirt and water entering your building. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another. These systems are also available for surface-mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

Digital Edition