EPA Kicks Off Fifth Annual Campus RainWorks Challenge

WASHINGTON, DC – The U.S. Environmental Protection Agency (EPA) recently launched its fifth annual Campus RainWorks Challenge, a competition for college and university students to design innovative solutions for our nation’s water infrastructure. Using their campuses as labs, teams develop green infrastructure systems to reduce stormwater pollution and build resilience to climate change. Since 2012, more than 420 student teams have participated in the challenge.

“Stormwater is one of the nation’s most significant water challenges, with increasing amounts of runoff polluting our nation’s streams, rivers and lakes,” says Joel Beauvais, deputy assistant administrator for EPA’s Office of Water. “Through the Campus RainWorks Challenge, EPA invites our country’s future planners, designers, and engineers to apply their classroom learning and help us solve stormwater management problems through innovative green infrastructure design and technology.”

Teams may register for the 2016 Challenge from September 1st to September 30th. The 2016 Challenge winners will be announced in spring 2017. Each first-place team will earn a student prize of $2,000 and a faculty prize of $3,000 to support green infrastructure research or training. Second-place teams will win $1,000 for student teams and $2,000 for faculty research.

Green infrastructure decreases pollution to local waterways by treating stormwater where it falls and keeping more polluted runoff out of sewer systems. Green infrastructure features include green roofs, permeable materials, green streets, rain gardens and rain harvesting systems. Communities are increasingly using green infrastructure to supplement their “gray” infrastructure such as pipes, filters and ponds.

Green infrastructure can create vibrant communities by increasing economic activity, neighborhood revitalization, job creation and open space. It also strengthens a community’s resiliency to the impacts of climate change by reducing the burden on local water infrastructure, managing local flooding, reducing urban heat islands and lowering energy demands.

More information is available at www.epa.gov/campusrainworks.

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

Digital Edition