Low Maintenance Floors for Cleaner Air

Low Maintenance Floors

The absence of fumes often associated with the application of flooring has positively impacted the well being of the maintenance staff, as well as students and teachers.

Christa McAuliffe Elementary School in Concord, N.H., is one of three new, futuristic elementary schools designed to meet the changing needs of 21st-century learning. Throughout the facility, norament grano rubber flooring supports a vision of open, collaborative, flexible and technology-integrated multi-use learning spaces.

“The facility is not only an elementary school, but also a community building that is heavily used before and after school for several town programs, such as the Boys & Girls Club,” says Matt Cashman, director of Facilities & Planning. “The durability and increased stain resistance — without the use of chemical cleaners or coatings — is a huge benefit realized by our district, when compared to our previous dealings with VCT.” The selection of nora flooring also helped the district meet Northeast-CHPS standards of sustainability.

“The elimination of coatings and chemicals has been a breath of fresh air, literally,” says Rusty Bonner, head custodian. The absence of fumes often associated with the application of these substances has positively impacted the well being of the maintenance staff, as well as students and teachers. “Just a few regular washes with little more than water erases any staining, allowing the floors to easily maintain their new appearance,” says Bonner. This is especially beneficial in spill-prone areas, including the cafeteria and art rooms. “It’s an easy-maintenance flooring,” says Bonner. “As a result, we can devote more time to cleaning alternate surfaces, such as glass.”

The rubber flooring also plays an important role where acoustics are concerned. Open project areas throughout the school, including an amphitheater, circular story room, reading nooks and spaces for small group work complemented by smartboards, benefit from the floor’s ability to attenuate unwanted ambient noise. Students and staff can better focus on listening and learning.

www.nora.com/us

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.