Tufts University Breaks Ground on Two New Residence Halls

Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market. The university is partnering with Capstone Development Partners through a public-private partnership (P3) to develop, finance, and manage the new property, as well as with Elkus Manfredi Architects and Erland Construction.

The development will take over a former parking lot and cover 271,000 square feet. The two buildings will contain studio, two-, four-, and six-bedroom units with an additional 12,000 square feet of amenity space, including lounges, conference rooms, laundry rooms, a bike room, and fitness and study spaces. It will also feature 4,000 square feet of retail and social spaces on the lower floors, local news reports.

“Aided by the expertise of our development team, we’ve been able to reduce construction costs and time and bring to fruition a project that will enhance student life, benefit our neighbors, and enliven our streetscape—all in an environmentally responsible way,” said Tufts University Executive Vice President Mike Howard.

The buildings will be all-electric and were designed with improved indoor air quality, enhanced energy efficiency, and airtight envelopes at top-of-mind. Landscaping and other off-site improvements will help blend the new facility into the existing neighborhood.

“This is more than a residence hall—it’s a community-building project,” said Walker May, Executive Vice President of Capstone. “By creating affordable, high-quality housing on campus, we’re supporting students and the surrounding neighborhood.”

The new space is scheduled to open for the fall 2027 semester, local news reports, and upper-division students will receive leasing priority.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.