Flooring Stands up to Harsh Conditions

hallway flooring

nora flooring has proven its ability to stand up to high traffic volume and harsh winters at Syracuse University.

Founded in 1870, Syracuse University in New York educates a student body of approximately 21,000 each year. With 70 percent of students living in the school’s 22 residence halls, the team overseeing housing has much to consider as they work to keep dormitories comfortable, safe and up-to-date.

Searching for a floor covering that could stand up to high-volume traffic and the brutal Syracuse winters, while offering a streamlined maintenance routine, the team selected nora rubber flooring to cover dorm entrance areas, corridors, common spaces and stairwells. Over the past seven years, the floor has outperformed expectations. “The versatility of nora lends itself to many different spaces,” says Robert J. Spagnoletti, manager of maintenance.

Spagnoletti offers an example of the transformation that has taken place in dorm stairwells. “The stairwells were previously concrete with a tread,” he says. “The way the nora all-in-one stair tread piece fits over the existing steps was just perfect. Installation was simple and easy, dealing with one piece. The stairs don’t look industrial any longer; they just look nice, and the rubber adds an element of safety.”

The floor’s easy maintenance regimen, which eliminates the use of coatings and wax, played a key role in the selection of rubber flooring. “That was a main driving factor,” says Spagnoletti. “We found a good product that we don’t have to wax and strip.” Since its installation, the nonporous rubber flooring has proven it can stand up to anything and deliver on performance.

“Our biggest challenge is the winters and dealing with the snow and salt, keeping the salt down outside, but minimizing the trailing effect inside,” Spagnoletti shares. The flooring has performed so efficiently that the maintenance team is using spare tiles of nora as walk-off pads for elevators during the winter.

“We’re getting strong support from all of our directors. They see the areas where nora has been installed and are happy with how it’s worked,” Spagnoletti says.

nora.com/us

This article originally appeared in the issue of .

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition