Energy Efficiency for a Living Building

empty classroom

Mitsubishi Electric helped the Willow School to meet the Living Building Challenge by providing energy efficient solutions that met the challenge’s guidelines.

When Mark and Gretchen Biedron co-founded the The Willow School, in Gladstone, N. J., their vision was to create a school that provides students with a space that celebrates learning and collaboration, and that fosters ethical relationships between people and the natural systems that support them. Sustainability drives both the curriculum and building design for Willow, so when the school was designing its fourth building — the Health, Wellness and Nutrition Center — the project team selected a Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric Cooling & Heating (Mitsubishi Electric).

Willow has a proud history of green building. In 2002, it built the first LEED Gold certified school building in the United States and, in 2007, the first LEED Platinum certified school in New Jersey. Ever the pioneers, Biedron and his team wanted to up the ante for the new Center. With this project, we were focused on taking the Living Building Challenge (LBC).

Each decision the project team made took careful consideration. Vin Farese, principal at Loring Consulting Engineers (project engineers) says, “Every load was tracked and analyzed. Every amp and watt was accounted for. Nothing was missed” while following the rigid LBC guidelines.

Biedron says, “To be Living Building certified, we had to make sure that we were getting our products from within a certain distance, but Mitsubishi [Electric] products just weren’t within that limit. However, Mitsubishi [Electric] quickly provided us with all of the documentation we needed to be able to get an exception to this rule. We proved that their products would be so energy-efficient over their lifetime that the one-time transportation expense would deliver a system that would ultimately save on cost and energy year after year after year.”

www.mitsubishielectric.com

This article originally appeared in the issue of .

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Big Horn Academy

    Big Horn Academy

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Big Horn Academy has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.