Energy Efficiency for a Living Building

empty classroom

Mitsubishi Electric helped the Willow School to meet the Living Building Challenge by providing energy efficient solutions that met the challenge’s guidelines.

When Mark and Gretchen Biedron co-founded the The Willow School, in Gladstone, N. J., their vision was to create a school that provides students with a space that celebrates learning and collaboration, and that fosters ethical relationships between people and the natural systems that support them. Sustainability drives both the curriculum and building design for Willow, so when the school was designing its fourth building — the Health, Wellness and Nutrition Center — the project team selected a Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric Cooling & Heating (Mitsubishi Electric).

Willow has a proud history of green building. In 2002, it built the first LEED Gold certified school building in the United States and, in 2007, the first LEED Platinum certified school in New Jersey. Ever the pioneers, Biedron and his team wanted to up the ante for the new Center. With this project, we were focused on taking the Living Building Challenge (LBC).

Each decision the project team made took careful consideration. Vin Farese, principal at Loring Consulting Engineers (project engineers) says, “Every load was tracked and analyzed. Every amp and watt was accounted for. Nothing was missed” while following the rigid LBC guidelines.

Biedron says, “To be Living Building certified, we had to make sure that we were getting our products from within a certain distance, but Mitsubishi [Electric] products just weren’t within that limit. However, Mitsubishi [Electric] quickly provided us with all of the documentation we needed to be able to get an exception to this rule. We proved that their products would be so energy-efficient over their lifetime that the one-time transportation expense would deliver a system that would ultimately save on cost and energy year after year after year.”

www.mitsubishielectric.com

This article originally appeared in the issue of .

Featured

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • Education Design Showcase

    Spaces4Learning Launches 2025 Education Design Showcase

    Spaces4Learning is now accepting submissions for the 2025 Education Design Showcase! Launched in 1999, the program celebrates innovative and practical solutions in planning, design, and construction.

  • diverse, simplified human figures in various colors seated around a curved table, with floating icons like light bulbs and speech bubbles above them

    Spaces4Learning Relaunches Advisory Board, Announces 12 Members

    Spaces4Learning is pleased to announce the relaunch of its advisory board and the introduction of its 12 distinguished members.