College of the Desert Hits Construction Milestone on New Campus

College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure. The $268-million campus will cover 175,000 square feet and is intended to provide a central hub for education and workforce training in the Coachella Valley.

“This moment is about far more than steel and structure, it’s about building opportunity,” said Val Martinez Garcia, Superintendent and President of College of the Desert. “The Palm Springs Campus is designed to meet the needs of today’s students and tomorrow’s workforce, connecting education directly to economic mobility and regional growth.”

The campus’ main facility, The Accelerator, will play home to the college’s Digital Media and Arts, Healthcare, and Architecture programs, according to a C.W. Driver news release. Other buildings will include a culinary institute, a multi-venue event center for larger community use, a central utility plant, a multi-modal mobility hub, and a Maintenance and Operations facility.

“This campus represents a new model for how community colleges can serve as engines of economic development,” said Ronald Oden, Board Chair of the Desert Community College District. “We are aligning education with opportunity—ensuring that students are prepared not just for jobs, but for careers that sustain families and strengthen our regional economy.”

The campus is aiming for LEED Gold certification, integrating photovoltaic power generation and sustainable building practices to reduce both cost and its environmental footprint. Completion is scheduled for fall 2027, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • University of Washington Opens New Broadcast Studio

    The University of Washington in Seattle, Wash., recently announced the opening of Sundodger Studios, a new broadcast, production, and content facility, according to a news release. The university partnered with Anthony James Partners for the design and development of the studio, which will host about 100 live broadcasts and 120 live videoboard shows per year.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.