Five Key Waterproofing Focus Areas

HGA’s Kevin Donaghey offer tips in considering the following specific areas where water can present challenges.

1. Above-grade Walls
It’s important to acknowledge that most exterior materials will take on rainwater at some point over the life of the building, and that an exit route for this water should always be accounted for in exterior wall assemblies. Rainwater should be viewed not as a passive element, but a force actively trying to penetrate the exterior barrier’s lines of defense. Analyzing exterior assemblies through this mindset can help to identify and provide adequate drainage pathways out of a rain-screen system for water that has found its way in.

2. Below-grade Systems
Ground water from surface rainfall or the water table, and its ability to infiltrate large areas of earth and into foundation systems, can be easily underestimated. Diversion of storm water run-off, extensive below-grade drain tile systems, and comprehensive membrane waterproofing at below-grade foundation walls can all serve to keep water out.

3. Roofs
Selecting a roofing system that meets the owner’s criteria for performance and budget can be a challenge, with reduced membrane thickness or warranty coverage being a tempting cost-reduction measure. We encourage the owner to err on the side of caution with roofing selection, even if it means adjusting project scope elsewhere.

4. Windows and/or Skylights
Skylights are typically more horizontally orientated than exterior wall window systems, and thus run a higher risk of water infiltration. Even with adequate slope, it is important that skylight assemblies be equipped with drainage channels, gutters and drop edges to usher rainfall onto the roof, and away from the skylight frame/roofing transition, which typically serves as the most susceptible part of the assembly. This can serve dual purposes (Example: the Language Arts and Humanities Building at East Los Angeles College features sloped skylights at a third-floor courtyard situated over occupied space, which funnel the rainwater into adjacent concrete planter boxes).

5. Doors
Doors located on exterior walls with exposure to the elements will pose increased risk of water infiltration. Drip edges, especially at the horizontal portion frame head, will divert water that would otherwise work its way inward.

This article originally appeared in the issue of .

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • East Carolina University Selects Architect for $60M Residence Hall Renovations

    East Carolina University in Greenville, N.C., recently announced that it has selected the KWK/Jenkins Peer Architects (JPA) team, collaborating with INTREPID Architecture, to design renovations for two of its residence halls, according to a news release.

  • DreamBox Math

    Discovery Education Debuts Enhancements to DreamBox Math

    Discovery Education recently announced that DreamBox Math, an online math program for K–8 students to supplement core instruction, has been updated to improve accessibility for K–5 students, according to a news release. DreamBox Math provides personalized instruction by adapting to individual learners’ responses and providing an engaging, dynamic learning environment.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.