Colorado School District First to Offset 100% Energy Use with Community Solar

Pueblo, Colo. – Clean Energy Collective (CEC), the nation’s leading community solar solutions provider, announced today that Pueblo County School District 70 (D70), the administrative arm of 34 schools in south central Colorado, has approved a contract securing 1.1 megawatts of solar capacity, or 11,456 solar PV panels, in two of CEC’s community solar arrays under development with Black Hills Energy. The move makes D70 the first school district in Colorado to offset 100 percent of its energy use for school facilities served by Black Hills Energy through community solar. The deal will net the district nearly $35,000 in savings in the first year, and more than $2 million in energy savings over the 20-year life of the program.

“As a public school district we are accountable to a high level of fiscally responsibility. Working with Clean Energy Collective we were able to meet that obligation by using community solar to reduce our energy costs and hedge against future energy price increases. But we can also do it in a way that helps us reach for higher environmental standards,” said D70 chief financial officer T.J. Vinci. “It’s exciting to be the first school district in the state to employ this strategy at this level, and I’m hopeful we are setting a positive example for the communities we serve and for other school districts.”

For D70, it was logistically challenging and cost prohibitive to build solar arrays at individual schools, with separate electric meters and a wide variety of roof types, age, and shading. Despite being the largest geographical school district in Colorado, with preschools, elementary, middle, and high schools serving 9,650 students, plus three transportation centers and an administrative building, D70 was able to consolidate its commitment into one community solar subscription, through CEC’s RooflessSolar program, with no upfront payment or recurring operations and maintenance costs and no changes to existing facilities.

“When this opportunity was presented to us by Black Hills Energy and Clean Energy Collective, we thought that this was the kind of example we should be setting as a board and as a district for our students and parents. This program is the perfect mix of economic responsibility and benefit blended with supporting sustainable and renewable energy sources,” said D70 school board chairman Ted Ortiviz.

“We are thrilled to see the Pueblo County School District participate in our Black Hills Energy community solar projects. Community solar is a superb solution for institutions like this seeking to reduce their utility costs, yet have limited ability to build individual systems onsite or don’t want the inherent maintenance hassles,” said Paul Spencer, CEC founder and CEO. “This speaks directly to the ‘community’ in community solar.”

The 1.1 MW allocation will generate an average of 2.2 million kilowatt hours (kWh) of clean energy per year, and more than 40 million kwh over 20 years.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition