University of Minnesota, Mankato: The Connection

University of Minnesota, Mankato

PHOTOS © LEO A DALY

The Connection at the University of Minnesota, Mankato (MSUM) solves a delicate campus planning challenge with two solutions in one — an underground pedestrian link crossing the campus mall, and an outdoor amphitheater/classroom that enhances student life.

Considered the heart of the campus, MSUM’s mall bustles with activity throughout the year. Connecting the student union, library and several classroom buildings, its robust program of sculptures and public spaces provide a gathering place for students that is welcoming, functional and artistic.

The university wanted to provide an ADA-compliant indoor passage for students crossing the mall from the library to the student union during the brutal Minnesota winters without introducing a disruptive element to the mall’s open, energetic design.

LEO A DALY responded by designing a pedestrian link that is integrated into the existing campus and becomes a key element to the campus mall: a “tunnel” with one side exposed to an amphitheater cut into the existing grade. In cold weather, a 33-foot expanse of curtain wall fills the indoor passageway with natural light. In nice weather, that same curtain wall plays backdrop to outdoor student performances, classes and movie nights.

Within the Connection, the east wall slopes back at 35 degrees from vertical. It is composed of shotcrete on top of excavated soil, waterproofing and a 3-inch-deep steel ribbed roof deck backfilled with concrete. This angled wall provides an efficient and compact structure for earth retainage, and made possible smaller and therefore less expensive footings as well as minimal disruption to the mall’s existing plantings and walking surfaces. In addition to being a structural element in the wall design, the roof decking served as a framework for the cast-in-place concrete (a project requirement). This minimized the need for supports and rented formwork and enabled construction to meet an aggressive schedule.

This article originally appeared in the issue of .

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • Abstract colorful arrows in front of a contemporary university building

    Spaces4Learning 2025 Trends in Higher Education

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in higher education from the experts in the trenches.

  • KnowBe4 Releases Report on Education Sector’s Preparedness for Cyberattacks

    Cybersecurity platform KnowBe4 recently released a new research report titled “From Primary Schools to Universities, The Global Education Sector is Unprepared for Escalating Cyber Attacks,” according to a news release.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition