EPA Webinar: An Introduction to Energy Savings Plus Health

Washington, D.C. — The United States Environmental Protection Agency (EPA) will broadcast a free webinar on July 11, from 1 p.m. to 2:30 p.m. ET on Indoor Air Quality in Schools entitled, “How to Integrate Energy Efficiency With Health & Safety Outcomes in Your School”

Webinar participants will learn how to:

  • Get started implementing the Energy Savings Plus Health guidance to integrate IAQ protections into school energy efficiency retrofits and other building upgrade projects.
  • Create a custom verification checklist using the Interactive Air Quality Planner.
  • Apply the best practices modeled by Des Moines Public Schools to realize cost savings and protect occupant health by integrating energy management activities and IAQ protection activities.

Explore these tools prior to the webinar! Download EPA’s Energy Savings Plus Health: Indoor Air Quality Guidelines for School Building Upgrades and the Interactive Air Quality Planner.

Featured IAQ Experts

  • Kudret Ütebay, The Cadmus Group, Inc., Arlington, Virginia
  • Dave Berger, Energy and Environmental Specialist, Des Moines Public Schools, Des Moines, Iowa

To register, go to register.gotowebinar.com.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.