Road Art That Lasts

Syracuse University

Syracuse University used Transpo Industries’ Color-Safe MMA Pavement Marking as a central part of their Connective Corridor project.

Syracuse University has been a staple in the City of Syracuse, NY, since 1870 and has always stayed at the forefront of continuous infrastructure innovation. Maintaining the state-of-the-art campus extends to their transit and transportation system, and to that end university officials and students created the “Syracuse Connective Corridor” project. This project set forth a goal, among others, to implement bike paths throughout the university, as well as connecting to the city. However, with the continuous university and city traffic coupled with the staggering winter weather conditions frequently seen in Syracuse, project officials were faced with an issue: finding a pavement marking material that would provide maximum durability while still maintaining the campuses beauty and offer maximum safety for cyclists.

For this they turned to Transpo Industries’ Color-Safe MMA Pavement Marking. Color-Safe is a new generation Methyl Methacrylate (MMA) resin component designed specifically for projects such as the Connective Corridor.

Color-Safe is easily distinguishable by its uniquely bright and resilient colors, a feature that fit in seamlessly with the university’s need to maintain the campuses famous scenic appeal.

Fitting with the university’s desire for eco-friendly practices, Color-Safe’s implementation uses minimal emissions of volatile organic compounds (VOC). Since it is also one of the longest lasting pavement markings available, Color-Safe also ensures minimal construction materials waste. Unlike thermoplastic paint, which is frequently used and needs to be reapplied every 6-12 months, MMA materials can last up to 10 years.

Finally, Color-Safe was designed to be extremely easy to apply, as well as fast curing in a wide variety of temperatures. For university officials, this meant minimizing labor cost as well as ensuring the bike lanes would be up and running with nominal road closures.

www.transpo.com

This article originally appeared in the issue of .

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition