Road Art That Lasts

Syracuse University

Syracuse University used Transpo Industries’ Color-Safe MMA Pavement Marking as a central part of their Connective Corridor project.

Syracuse University has been a staple in the City of Syracuse, NY, since 1870 and has always stayed at the forefront of continuous infrastructure innovation. Maintaining the state-of-the-art campus extends to their transit and transportation system, and to that end university officials and students created the “Syracuse Connective Corridor” project. This project set forth a goal, among others, to implement bike paths throughout the university, as well as connecting to the city. However, with the continuous university and city traffic coupled with the staggering winter weather conditions frequently seen in Syracuse, project officials were faced with an issue: finding a pavement marking material that would provide maximum durability while still maintaining the campuses beauty and offer maximum safety for cyclists.

For this they turned to Transpo Industries’ Color-Safe MMA Pavement Marking. Color-Safe is a new generation Methyl Methacrylate (MMA) resin component designed specifically for projects such as the Connective Corridor.

Color-Safe is easily distinguishable by its uniquely bright and resilient colors, a feature that fit in seamlessly with the university’s need to maintain the campuses famous scenic appeal.

Fitting with the university’s desire for eco-friendly practices, Color-Safe’s implementation uses minimal emissions of volatile organic compounds (VOC). Since it is also one of the longest lasting pavement markings available, Color-Safe also ensures minimal construction materials waste. Unlike thermoplastic paint, which is frequently used and needs to be reapplied every 6-12 months, MMA materials can last up to 10 years.

Finally, Color-Safe was designed to be extremely easy to apply, as well as fast curing in a wide variety of temperatures. For university officials, this meant minimizing labor cost as well as ensuring the bike lanes would be up and running with nominal road closures.

www.transpo.com

This article originally appeared in the issue of .

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.