Rodents: How Are They Getting In, How Do We Stop Them?

It’s critical that pest problems be identified and addressed as quickly as possible because rodents breed quickly — a single pair of rats can multiply into 640 within a year, and mice can multiply to over 1,000. Stopping them for good means finding the points of entry and sealing them up to prevent future invasion. Below are some of the most common entry points and exclusion solutions. Remember, when conducting your inspection, mice can fit through a gap of about 1/4 inch and rats through a gap of 3/8 inch.

Common Entry Points and Solutions:

  • Exterior doors — Damaged or worn out sweeps are one of the most common entry points. Most standard brush or vinyl sweeps keep out the weather but not mice and rats. All doors should be fitted with specialized rodent-proof door sweeps.
  • Vents and grilles — Protect them with screen or mesh and ensuring any voids or gaps around them are filled with a pest exclusion material.
  • Drain pipes — Rats are excellent swimmers. Make sure exterior drain and sewer access points are covered with an appropriate metal cover. Openings surrounding the drain should be patched or filled.
  • Vertical wires and pipes — Mice and rats are excellent climbers. Circular rat guards should be placed around all vertical wires and pipes.
  • Utility and other building penetrations — Check places where pipes, wires or HVAC enter the building and fill any gaps with pest exclusion material.

Ensure the exterior of the building, especially around the foundation, is free from harborage areas such as shrubs and ground cover, and eliminate any “bridges” to the roof, like overhanging trees.

This article originally appeared in the issue of .

About the Author

Drew McFadden is director of Marketing for Xcluder, and can be reached at [email protected].

Featured

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.