Rodents: How Are They Getting In, How Do We Stop Them?

It’s critical that pest problems be identified and addressed as quickly as possible because rodents breed quickly — a single pair of rats can multiply into 640 within a year, and mice can multiply to over 1,000. Stopping them for good means finding the points of entry and sealing them up to prevent future invasion. Below are some of the most common entry points and exclusion solutions. Remember, when conducting your inspection, mice can fit through a gap of about 1/4 inch and rats through a gap of 3/8 inch.

Common Entry Points and Solutions:

  • Exterior doors — Damaged or worn out sweeps are one of the most common entry points. Most standard brush or vinyl sweeps keep out the weather but not mice and rats. All doors should be fitted with specialized rodent-proof door sweeps.
  • Vents and grilles — Protect them with screen or mesh and ensuring any voids or gaps around them are filled with a pest exclusion material.
  • Drain pipes — Rats are excellent swimmers. Make sure exterior drain and sewer access points are covered with an appropriate metal cover. Openings surrounding the drain should be patched or filled.
  • Vertical wires and pipes — Mice and rats are excellent climbers. Circular rat guards should be placed around all vertical wires and pipes.
  • Utility and other building penetrations — Check places where pipes, wires or HVAC enter the building and fill any gaps with pest exclusion material.

Ensure the exterior of the building, especially around the foundation, is free from harborage areas such as shrubs and ground cover, and eliminate any “bridges” to the roof, like overhanging trees.

This article originally appeared in the issue of .

About the Author

Drew McFadden is director of Marketing for Xcluder, and can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

Digital Edition