Walls Stand Up to Demands of Nursing Education

Acrovyn

Acrovyn by Design partition walls stood up to the rigorous demands of a nursing lab environment, while also fitting in well with the lab’s “healthcare aesthetic.”

A reflection of the growing healthcare occupational trend is apparent in Pellissippi State Community College’s Nursing Program, where enrollment at the Knoxville, TN, campus continues to increase. The college’s administrators wanted to transform a single, open lab space and a classroom into three protected, unique spaces. The solution included Acrovyn by Design on partition walls to artfully designate separate areas.

The learning environment in the Jenny & Randy Boyd Building at the Strawberry Plains campus required renovations of the 24,250 available-square-feet to meet the needs of both students and faculty.

The addition of an operable wall was necessary to better accommodate multiple teaching scenarios, such as learning how to perform and master skills prior to entering the obstetric and pediatric clinical sites.

It was essential that the walls in the nursing skills lab could contend with a busy, educational atmosphere. This required the walls to be durable and easy to clean. The design team focused on delivering a look that exceeded all the project’s requirements for durability, professionalism and cleanliness.

“Our solution to put Acrovyn by Design on the partition walls makes them as beautiful as they are easy to clean. We are also pleased with the durability Acrovyn by Design brings to Pellissippi’s nursing skills lab. In a dynamic learning space with moving nursing beds and carts, protection for the operable walls was imperative,” says Bill Vinson of Community Tectonics Architects. “Acrovyn by Design’s Organic Collection fit beautifully into the lab’s healthcare aesthetic.”

Pleased with the beautiful modification of its nursing skills lab, Pellissippi administrators requested that Acrovyn by Design be placed on additional partition walls in the pediatric skills lab, the obstetrics lab and another classroom at the Strawberry Plains campus as well.

www.acrovynbydesign.com

This article originally appeared in the issue of .

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

Digital Edition