Bowling Green State University: Moseley Hall

Bowling Green State University

PHOTOS COURTESY OF DESIGNGROUP

Moseley Hall, a Traditions Building on the campus of Bowling Green State University (BGSU), has been completely renovated and updated to be an interdisciplinary science laboratory building. Opened in August, the 43,000-square-foot building is devoted to best practices in undergraduate science education and provides space for the Biology (including Anatomy and Physiology), Chemistry, Forensics and Geology departments, as well as the medical laboratory science program.

Designed by DesignGroup’s Columbus, OH, office in collaboration with Ayers Saint Gross of Baltimore, the building is located on the historic Traditions Quad of the campus in Bowling Green, OH. Both science majors and non-science majors will enjoy access to the new facilities.

Originally an agriculture and science building when it was erected in 1916, Moseley Hall was once home to livestock on the first floor. Since the late 1960s it has been used for general classroom space. This $21 million renovation project returns it to its roots as a science building.

The four-story building includes two sets of cutting-edge teaching labs on each floor, with stock and prep rooms and open collaborative spaces in between that encourage engaged learning experiences between students and faculty and group interaction. All super-flex labs have been designed to encourage maximum flexibility in use- and evidence-based approaches to science teaching and learning.

The top floor will house Chemistry; the second and third floors will be devoted to the biological sciences; while the lower level will be shared by Geology and the medical laboratory science program.

“The guiding concept for the renovation of Moseley Hall centered around incorporating up-to-date lab technology and contemporary design inside while restoring the historic structure on the outside,” says DesignGroup Project Manager John Schilling. “Its dynamic learning environment, with spaces for formal and informal learning, is designed to promote critical thinking, academic excellence and outstanding professional preparation.”

This article originally appeared in the issue of .

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition