Academic Building Completed at UMass Amherst

The first and largest cross-laminated timber (CLT) academic building in the U.S. has opened at the University of Massachusetts (UMass) Amherst. Designed by Leers Weinzapfel Associates, the multidisciplinary John W. Oliver Design Building brings together 500 students and 50 faculty across four departments into a light-filled 87,000-square-foot space. As a beacon of sustainability, the building features energy-saving elements, such as chilled beams and radiant flooring, and targets LEED Gold certification.

UMASS Amherst Cross Timber Building

Photo: Albert Vecerka / Esto

Cross-laminated timber has long been praised for its durability, lightness, and speed of construction, however, has been slow to catch on in the U.S. relative to Europe and Canada. As the largest installation of wood-concrete composites in North America, the UMass Design Building paves the way in a growing trend of “mass timber” buildings. Cast-in-place concrete and CLT make up the Design Building’s floor slabs, while glue-laminated timber was used for the posts, beams, shear wall cores, and “zipper” trusses.

To reference the colors and patterns of the nearby forests, the four-story building is wrapped in a durable envelope of copper-colored anodized aluminum panels punctuated with vertical windows. The glazing and skylights maximize daylight to the interior to reduce reliance on artificial lighting. Stormwater is managed onsite with bioswales and timber dams that filter and redirect runoff back to the Connecticut River.

“To create a center space of collaboration, a coiling and rising band of studios, faculty offices and classrooms surrounds a skylit commons for gathering and presentations,” write the architects. “The building also forms a green roof terrace, a contemplative space shared by the studios and faculty and a potential experimental space for the landscape department. The slope of the site creates a tall four-story façade on the west facing the mall, and the rising structure invites the community into the building and reveals the activities within.”

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • AAADM Announces Building Safety Month Initiatives

    The American Association of Automatic Door Manufacturers (AAADM) recently announced its support of Building Safety Month as declared by the International Code Council (ICC), according to a news release.