Academic Building Completed at UMass Amherst

The first and largest cross-laminated timber (CLT) academic building in the U.S. has opened at the University of Massachusetts (UMass) Amherst. Designed by Leers Weinzapfel Associates, the multidisciplinary John W. Oliver Design Building brings together 500 students and 50 faculty across four departments into a light-filled 87,000-square-foot space. As a beacon of sustainability, the building features energy-saving elements, such as chilled beams and radiant flooring, and targets LEED Gold certification.

UMASS Amherst Cross Timber Building

Photo: Albert Vecerka / Esto

Cross-laminated timber has long been praised for its durability, lightness, and speed of construction, however, has been slow to catch on in the U.S. relative to Europe and Canada. As the largest installation of wood-concrete composites in North America, the UMass Design Building paves the way in a growing trend of “mass timber” buildings. Cast-in-place concrete and CLT make up the Design Building’s floor slabs, while glue-laminated timber was used for the posts, beams, shear wall cores, and “zipper” trusses.

To reference the colors and patterns of the nearby forests, the four-story building is wrapped in a durable envelope of copper-colored anodized aluminum panels punctuated with vertical windows. The glazing and skylights maximize daylight to the interior to reduce reliance on artificial lighting. Stormwater is managed onsite with bioswales and timber dams that filter and redirect runoff back to the Connecticut River.

“To create a center space of collaboration, a coiling and rising band of studios, faculty offices and classrooms surrounds a skylit commons for gathering and presentations,” write the architects. “The building also forms a green roof terrace, a contemplative space shared by the studios and faculty and a potential experimental space for the landscape department. The slope of the site creates a tall four-story façade on the west facing the mall, and the rising structure invites the community into the building and reveals the activities within.”

Featured

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.