Massachusetts School Gets Additions and Renovations

Encouraging creative thinking, collaboration and community is at the core of the addition and renovation project, now open, at the Brimmer and May School in Chestnut Hill. Designed by the Boston office of Perkins+Will, the new and repurposed spaces foster active learning at the co-ed, independent PreK-12 school.

“Historically, we have been a school that leads with pedagogy and curriculum,” said Judy Guild, head of school at Brimmer and May. “Perkins+Will was a great partner for us in that they engaged teachers and staff to determine the optimal types of spaces required to teach students, to drive creativity, and to foster a sense of community. This project has created a flexible, open space where students naturally gravitate.”

The addition supports independent and collaborative work, critical thinking, and analytics, enhanced by emerging technologies and hands-on problem solving. The space includes a new innovation lab, dedicated maker space with equipment for fabrication, a STEAM (science, technology, engineering, arts, and mathematics) room and a “student commons” designed for multi-uses along with additional space to support group work, independent thinking and project-based learning. The additional classrooms and new administrative areas are strategically located to promote teacher collaboration while integrating an inviting and secure entryway.

Brimmer and May

“It was our goal to ensure an integrated design process bringing together the school’s pedagogy along with the need to provide the flexibility that supports a multidisciplinary approach to learning, within the context of Chestnut Hill’s residential neighborhood,” says Brooke Trivas, K-12 practice leader and principal at Perkins+Will.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.