Massachusetts School Gets Additions and Renovations

Encouraging creative thinking, collaboration and community is at the core of the addition and renovation project, now open, at the Brimmer and May School in Chestnut Hill. Designed by the Boston office of Perkins+Will, the new and repurposed spaces foster active learning at the co-ed, independent PreK-12 school.

“Historically, we have been a school that leads with pedagogy and curriculum,” said Judy Guild, head of school at Brimmer and May. “Perkins+Will was a great partner for us in that they engaged teachers and staff to determine the optimal types of spaces required to teach students, to drive creativity, and to foster a sense of community. This project has created a flexible, open space where students naturally gravitate.”

The addition supports independent and collaborative work, critical thinking, and analytics, enhanced by emerging technologies and hands-on problem solving. The space includes a new innovation lab, dedicated maker space with equipment for fabrication, a STEAM (science, technology, engineering, arts, and mathematics) room and a “student commons” designed for multi-uses along with additional space to support group work, independent thinking and project-based learning. The additional classrooms and new administrative areas are strategically located to promote teacher collaboration while integrating an inviting and secure entryway.

Brimmer and May

“It was our goal to ensure an integrated design process bringing together the school’s pedagogy along with the need to provide the flexibility that supports a multidisciplinary approach to learning, within the context of Chestnut Hill’s residential neighborhood,” says Brooke Trivas, K-12 practice leader and principal at Perkins+Will.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.