University Restores HVAC System Performance

HVAC

The University of Arkansas achieved better IAQ and less energy consumption in their buildings with the help of UV-C from UV Resources.

When your campus is home to 27,000 students, indoor air quality (IAQ) is of utmost importance. Located in Fayetteville, the University of Arkansas has 100 buildings served by approximately 150 air handling units (AHUs), each designed to condition and filter campus airstreams.

Rick Gragg, HVAC coordinator with the university’s Utility Operations Facility Operation department, has supervised a decade-long mission to improve IAQ by retrofitting campus AHUs with ultraviolet germicidal irradiation. The technology uses light in the ultraviolet-C (UV-C) spectrum to remove biological growth from HVAC/R equipment, ensuring safe and clean air for students and faculty.

Gragg’s experience with UV-C began in 2008, when facilities personnel alerted him to complaints about biological growth accumulation on the air distribution registers in the Health, Physical Education and Recreation Building.

Using this as a test case for UV-C, Gragg had his contractor retrofit the lights on two air handlers downstream of the coil that service the building. He chose the RLM Xtreme fixtureless UV-C lamp system, manufactured by Santa-Clarita, California-based UV Resources.

Over a three-month period of UV-C treatment, measurements revealed a coil pressure drop decrease from nearly 1.0 inch to less than 0.8-inch of static pressure. This 2/10th of an inch reduction meant that the AHU fan didn’t need to strain to draw air through the plenum, providing energy savings and disinfection.

“Once the coil was cleaned and returned to its original ‘as-built’ specification, the system did not need to consume as much energy. As a result, we could lower the brake horse power by 1.311 and save roughly $1,077 in annual energy costs,” reports Gragg.

Convinced of UV-C’s effectiveness, the university has continued to install the units ever since—48 to date—across campus as standard practice. The most recent application involved installing the technology in two air handling units in February 2018.

www.uvresources.com

This article originally appeared in the College Planning & Management March 2018 issue of Spaces4Learning.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition