Pinellas Technical High School Construction Underway

JE Dunn Construction is transforming a career and technical education center built 57 years ago into the first full-time technical high school for Pinellas County Schools in Florida.

Pinellas Technical High School

The $13.2-million project establishing the Pinellas Technical High School at Seminole involves constructing a 34,335-square-foot, two-story building with classrooms, administrative offices and kitchen and cafeteria areas; renovating 26,250-square-foot of existing classroom and administration building; and making site improvements to the 42-acre campus, established in 1961.

The new “Tech High” will accommodate enrollment growth and, with its new full-day schedule of classes, augment the curriculum to include the full spectrum of courses students need to graduate from high school as well as honors and advanced placement classes. The school’s technical offerings will be: building trades and construction design technology, commercial and digital arts, electricity, nursing, veterinary assisting, and game or simulation programming.

The new facility—which will replace the Career Academies of Seminole—is scheduled to open August 2018.

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.