A Versatile Solution for Sanitation in Schools

GVC-18VACCleanliness and sanitation are top of mind for many facility managers, especially when the building’s occupants contain today’s youth. In addition to seasonal cleaning concerns relating to flu and then allergy season, there is a heightened focus on food allergens and the potential for contamination. When you start to think of all of the places where bacteria, mold, viruses and allergens can be, it feels a little daunting to think about where to start. It’s not a matter of whether the cleaning and sanitation should occur, but the best way to get it done.

Goodway’s new ETL Certified, GVC-18VAC is a portable and diverse solution to have in your janitorial lineup. The GVC-18VAC combines dry steam cleaning and an award-winning vacuum system to clean and sanitize almost any surface—whether it is a desk, a door handle, carpet or upholstery. It can be used in the classroom, locker rooms, lunchroom, gyms, anywhere safety and cleanliness is key. With bacteria, dust, mold and biological allergens being just a few reasons for sickness and poor indoor air quality, getting rid of those contaminants is a good start to making improvements to the environment.

Made for flexibility and ease, the two-in-one steam and vacuum system allows the user to find the ideal setting for any job, while also regulating the flow of hot water, maintaining the perfect moisture control level to effectively clean and sanitize. The environmentally-friendly GVC-18VAC provides quick and effective cleaning without any chemicals by utilizing steam pressure, minimizing water consumption at a high temperature. The high temperatures kill mold, bacteria and other microorganisms on contact. The built-in vacuum is equipped with an innovative UV-C germicidal light technology that kills collected bacteria before exhausting purified clean air.

Dry steam cleaning technology offers many benefits. Using as little as 5 percent moisture content, it can be applied in environments where the use of water is not acceptable or should be avoided. It provides a thorough and consistent deep cleaning that can reach small holes and crevices that are typically hard to access for cleaning. Additionally, no chemicals are used.

“Merging dry vapor steam and vacuum capabilities into one convenient tool for facility managers makes maintenance in a variety of situations much easier,” says Tim Kane, president of Goodway Technologies. “The GVC-18VAC offers the best of both worlds and is a simple, yet effective solution for maintenance professionals.”

Improving health of your school should be a priority—and easier to achieve. For more information on the GVC-18VAC or Goodway’s complete line of facility maintenance equipment, visit www.goodway.com or call 1-800-333-7467.

Sponsored by: Goodway Technologies

Featured

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.