Texas A&M University: Student Recreation Center Expansion and Renovation

Texas A&M University

PHOTOS © ZAC SEEWALD

The Texas A&M Student Recreation Expansion and Renovation project added 100,000 square feet to an already significant building footprint (290,000 square feet) for a growing student population in College Station, TX.

Marmon Mok Architecture, who specializes in campus recreation building design, implemented the following strategies, and more, in the design of the expansion and renovation of the Recreation Center, also originally designed by the firm: High use/low cost, quality space to lead the market, and connecting inside and outside.

High use means all activity spaces are multifunctional. Economic sustainability resulted from providing each space with the capability to accommodate general recreation activities, fee-based recreation activities, and rentals for special events.

Low cost of operation resulted from long-lasting building systems, materials, and equipment; reduced energy costs; and strategic positioning of staff and multi-purpose space to build less space and reduce staff cost.

Quality space incorporates movable walls for flexibility, technology for user instruction and presentation, daylight, and user controls for air and light, views, and air quality. Expansive windows, clerestories, and translucent walls produced abundant natural light and inspiring views throughout activity spaces.

The 10,000-square-foot terrace to the north is complete with a shade canopy, planters, an outdoor kitchen, and a commanding view of Kyle Field. Multiple balconies at multipurpose rooms to the south overlooking the baseball stadium outfield have become the new “Aggie Alley” on game day.

Additional program: weight room expansion (doubled); eight-lane lap pool, four multipurpose group exercise rooms; boxing and combatives room; double basketball court/soccer gymnasium.

The project received the NIRSA Outstanding Sports Facility national award from the National Intramural & Recreational Sports Association at the 2018 conference.

This article originally appeared in the College Planning & Management May 2018 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition