Washington University: Francis Field House

Washington University

PHOTOS © HASTINGS+CHIVETTA ARCHITECTS, INC. / FENTRESS PHOTOGRAPHY

Washington University’s historic Francis Field House has been transformed by Hastings+Chivetta Architects and Bohlin Cywinski Jackson into a 21st-century fitness, athletic, and recreation center. Built in 1902, Francis Field House is a registered historical landmark and was the site of the 1904 Olympic Games. The new LEED Gold Gary M. Sumers Recreation Center, created through an addition and renovation to the Field House, is an innovative facility that honors its historic legacy.

The original entry to the Field House was restored as the main access point from the expanded facility. All floors in the “head house” were removed, creating a multi-story space through which a 16-foot-long bridge, surfaced with hardwood salvaged from the original gymnasium floor, connects old and new and serves as the primary control point for day-to-day users. A multi-story fitness center is the heart of the plan, surrounded by multipurpose lounge and support spaces, with direct access to all other components of the facility. A new three-court gymnasium with track was added to the south with athletic locker rooms and meeting and training spaces below.

Floor-to-ceiling windows, skylights, and clerestories provide ample daylight that permeates the facility. Articulated wood surfaces with reveals between panels are a subtle and sophisticated incorporation of the university’s red color. A dramatic art installation covers the interior entrance wall. The recreation gym features the largest stained wood gym floor in the Midwest, which celebrates the significant history and location of the university in St Louis, MO.

Both the new addition and a 1980s Athletic Complex addition were wrapped in a glass-enclosed colonnade featuring masonry piers capped with Indiana limestone and aluminum panel details, thus preserving the architectural and visual integrity of the original Field House.

This article originally appeared in the College Planning & Management May 2018 issue of Spaces4Learning.

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition