Open But Secure

Located in one of the toughest areas in South Central Los Angeles the Animo South Los Angeles High School, a new public charter high school for 630 students, is visually open but entirely secured. The area was a central trouble spot during the 1964 Watts and the 1992 Rodney King Riots. Fair Housing and school busing has plagued the area since the early 60s, where median family income is less than $35,000/year and 25 percent of the population lives below the poverty level.

On July 22, 2014, a massive fire broke out and destroyed half of the campus. This new replacement building contains 11 classrooms, two science labs, faculty lounge, new administrative and counseling offices, and public courtyard space for student gatherings and activities.

South Los Angeles High is a progressive, public charter high school known for its collaborative, curriculum and strong community connection. This building and addition to the 1950s campus creates a flexible teaching environment that supports significant parental involvement and puts student life at the center of the school and unites the campus community.

Designed on an extremely limited budget and aggressive schedule, simple cost-effective gestures were deployed in the use of cladding, fenestration, color and transparency to create a memorable sense of richness, providing a bright moment in an extremely tough inner-city community.

Unlike most school that are enclosed by a property line security fence, the South Los Angeles High School building is surrounded by a 20-foot-high perforated bullet-resistant metal walls that are integrated into the building design. This creates light filled courtyards for outside activity that is connected directly to classroom activities. This arrangement of courtyard design allows the building to breathe fresh air and daylight while providing a safe and secure environment for leaning and social engagement. Open-air light-filled halls and classrooms, as well as the building transparency, express the school’s values and provide a healthy, sustainable learning environment. The building form and primary courtyard are formed by a series of required clearances around an oil well abandoned in the late 1970s, a series of power line and utility easements, height restrictions, and zone changes running through the site that constrain the form and size to its maximum possible building-area envelope.

The perforated anodized aluminum façade panels of the building create an ever-changing screen that sparkles in the sun and glows at night, while simultaneously providing shade to cool the building, reducing noise, enhancing privacy, and still allowing for views, great natural light, and ventilation that pass through its millions of perforations. The material reappears as a strategic arrangement of screens around the building, lending a subtle rhythm to the exterior circulation. The walls filter direct sunlight that lends unexpected visual depth while creating a sense of security for the occupants. Enhancing the structure’s geometric texture, the irregular array of openings variably extrudes from the building’s surface. Its unique architectural form and integrated function creates a high-performing building that is an expression of the people who live there and the environmental and cultural context in which it is built.

The cost of the 18,000 square-foot project was $3,300,000.00. Brooks + Scarpa served as the lead architectural firm. Franco + Associates served as associate architect. Construction was done by Blackwell Construction, Inc.

Featured

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Midland ISD Starts Construction on Two New High Schools

    The Midland Independent School District recently announced that it will break ground on two new high schools in Midland, Texas, according to a news release. The district is partnering with Pfluger Architects, Lee Lewis Construction, and Satterfield & Pontikes to create a total of over 1.5 million square feet for 8,400 students in grades 9–12.

  • University of Kentucky Stormwater Harvesting System Receives Award

    The Utilities and Energy Management team from the University of Kentucky recently received a Grand Award at the 2025 Engineering Excellence Awards, according to a university news release. The award from the American Council of Engineering Companies of Kentucky was for the university’s Central Utility Plant (CUP) Stormwater Harvesting System, which activated in fall 2023.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

Digital Edition