Pittsburgh Playhouse Opens at Point Park University

The new Pittsburgh Playhouse continues Point Park University’s long tradition of historic preservation and creative reuse, incorporating two historic structures: the University Center originally designed by Frederick J. Osterling for the Colonial Trust Company, and the Stock Exchange Building, originally designed by prominent architect Charles M. Bartberger. Careful to consider the aesthetic of its location, DLR Group|WRL designers created an exterior façade that complements the Playhouse’s historic Pittsburgh, PA, setting architecturally.

Pittsburgh Playhouse

Situated on 1.5 acres at the university’s downtown Pittsburgh campus, the 90,411-square-foot complex is a substantial addition. The project features three new theaters: a 550-seat proscenium/thrust main stage and multi-form 212-seat “transformational thea­ter,” both of which feature variable enclosures that allow each venue to play to its urban neighborhood, and a 102-seat black box venue. It also houses a sound stage, scenery shop, prop shop, paint shop, costume shop, television studio, scenic design and general classrooms, rehearsal halls, acting studios, classrooms, and faculty offices as well as public amenities such as lobbies, concessions, ticket/business office, and performer support. Other labs and shops and studios are exposed to the internal circulation system and to the street itself, communicating the vitality of making, fabrication, experimentation, and creativity.

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.