Pittsburgh Playhouse Opens at Point Park University

The new Pittsburgh Playhouse continues Point Park University’s long tradition of historic preservation and creative reuse, incorporating two historic structures: the University Center originally designed by Frederick J. Osterling for the Colonial Trust Company, and the Stock Exchange Building, originally designed by prominent architect Charles M. Bartberger. Careful to consider the aesthetic of its location, DLR Group|WRL designers created an exterior façade that complements the Playhouse’s historic Pittsburgh, PA, setting architecturally.

Pittsburgh Playhouse

Situated on 1.5 acres at the university’s downtown Pittsburgh campus, the 90,411-square-foot complex is a substantial addition. The project features three new theaters: a 550-seat proscenium/thrust main stage and multi-form 212-seat “transformational thea­ter,” both of which feature variable enclosures that allow each venue to play to its urban neighborhood, and a 102-seat black box venue. It also houses a sound stage, scenery shop, prop shop, paint shop, costume shop, television studio, scenic design and general classrooms, rehearsal halls, acting studios, classrooms, and faculty offices as well as public amenities such as lobbies, concessions, ticket/business office, and performer support. Other labs and shops and studios are exposed to the internal circulation system and to the street itself, communicating the vitality of making, fabrication, experimentation, and creativity.

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.