University of Iowa Constructing Psychological and Brain Sciences Building

Construction is underway on the campus of the University of Iowa (UI) in Iowa City for a facility that will be the new home of UI’s Department of Psychological and Brain Sciences.

Iowa Brain Science

The new $33.5 million, 66,470-square-foot building will include 70-student and 30-student classrooms that can be combined for use as high-tech TILE (spaces to Transform, Interact, Learn, and Engage) classrooms.

With 15 cutting-edge labs for human research, the building will be better equipped for faculty and graduate and undergraduate students to conduct research. The labs will be clustered by areas of research to promote collaboration and interaction and will, with its new family waiting area, provide a more “welcoming and friendly environment” for parents with children who are waiting to taking part in research projects.

Completion is tentatively set for summer 2019.

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.