North Olmsted City Schools Opens New $90-million Campus

The first school bell at the North Olmsted (Ohio) City Schools' $90 million facilities project—a new grade 6-12 educational, performing arts center and athletic complex—opened in September. The exterior of the building is emphasized by the late 19th-century Georgian Architecture characterized by its proportion, symmetry, and balance. More than half of the 38.5 acres of the property is located in a flood zone which posed challenges for the 315,000-square-foot campus, including creating separate entrances for the middle and high school, performing arts center, and stadium.

North Olmsted City Schools

Middle school students (grades 6-8) are organized in 6 studios, two per grade level. Each studio houses 150 students, and consists of four general classrooms, one science lab, two small-group rooms, teacher prep room with storage, central collaboration area with presentation platform and adjoining restroom facilities.

The high school (grades 9-12) features labs on the first floor while core classrooms are located on the second floor. Each wing has a defined collaborative area surrounded by classrooms and small-group rooms. Classroom and adjacent spaces are technology-rich with flexible furniture. Transparency of rooms and open hallways provide clear lines of sight enhancing the monitoring and supervision of students.

Designed as a hub rather than a space for lunch, the cafeteria features the school’s orange color and offers high-top tables, moveable furniture, Wi-Fi and charging stations.

The interior color palette, patterns and classical elements such as niches, alcoves and columns provide a sophisticated twist of the 21st-century design flexibility. Color scheme for the middle school is energetic while the high school scheme is calm and sophisticated. Symbolizing the district’s rich history in the arts, an 850-seat performing arts center with oversized proscenium opening evokes a feeling of professional theater. Adjacent to the campus is a new 4,000-seat stadium which features artificial turf football/soccer field and track. Heated lockers rooms, restrooms, and concession stands are located below the stands.

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition