North Olmsted City Schools Opens New $90-million Campus

The first school bell at the North Olmsted (Ohio) City Schools' $90 million facilities project—a new grade 6-12 educational, performing arts center and athletic complex—opened in September. The exterior of the building is emphasized by the late 19th-century Georgian Architecture characterized by its proportion, symmetry, and balance. More than half of the 38.5 acres of the property is located in a flood zone which posed challenges for the 315,000-square-foot campus, including creating separate entrances for the middle and high school, performing arts center, and stadium.

North Olmsted City Schools

Middle school students (grades 6-8) are organized in 6 studios, two per grade level. Each studio houses 150 students, and consists of four general classrooms, one science lab, two small-group rooms, teacher prep room with storage, central collaboration area with presentation platform and adjoining restroom facilities.

The high school (grades 9-12) features labs on the first floor while core classrooms are located on the second floor. Each wing has a defined collaborative area surrounded by classrooms and small-group rooms. Classroom and adjacent spaces are technology-rich with flexible furniture. Transparency of rooms and open hallways provide clear lines of sight enhancing the monitoring and supervision of students.

Designed as a hub rather than a space for lunch, the cafeteria features the school’s orange color and offers high-top tables, moveable furniture, Wi-Fi and charging stations.

The interior color palette, patterns and classical elements such as niches, alcoves and columns provide a sophisticated twist of the 21st-century design flexibility. Color scheme for the middle school is energetic while the high school scheme is calm and sophisticated. Symbolizing the district’s rich history in the arts, an 850-seat performing arts center with oversized proscenium opening evokes a feeling of professional theater. Adjacent to the campus is a new 4,000-seat stadium which features artificial turf football/soccer field and track. Heated lockers rooms, restrooms, and concession stands are located below the stands.

Featured

  • Western Kentucky University Breaks Ground on First Phase of $350M Student Housing Project

    Western Kentucky University (WKU) in Bowling Green, Ky., recently broke ground on the first phase of a $350-million student housing initiative, according to a news release. The university is partnering with Gilbane Development through a public-private partnership (P3) to replace aging residence halls and modernize on-campus living accommodations.

  • University of Michigan Launches AI App Store

    The University of Michigan in Ann Arbor, Mich., recently announced the launch of the Michigan AI App Store, according to a university news release. The service allows faculty, students, and staff the ability to connect university AI tools with their own personal services like Gmail, Google Calendar, Dropbox, and more.

  • California High School Completes Construction on New Makerspace Facility

    Lynbrook High School, part of the Fremont Union High School District (FUHSD) in San Jose, Calif., recently held a ribbon-cutting ceremony for a new Makerspace Building, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the building’s design and Blach Construction for building services.