North Olmsted City Schools Opens New $90-million Campus

The first school bell at the North Olmsted (Ohio) City Schools' $90 million facilities project—a new grade 6-12 educational, performing arts center and athletic complex—opened in September. The exterior of the building is emphasized by the late 19th-century Georgian Architecture characterized by its proportion, symmetry, and balance. More than half of the 38.5 acres of the property is located in a flood zone which posed challenges for the 315,000-square-foot campus, including creating separate entrances for the middle and high school, performing arts center, and stadium.

North Olmsted City Schools

Middle school students (grades 6-8) are organized in 6 studios, two per grade level. Each studio houses 150 students, and consists of four general classrooms, one science lab, two small-group rooms, teacher prep room with storage, central collaboration area with presentation platform and adjoining restroom facilities.

The high school (grades 9-12) features labs on the first floor while core classrooms are located on the second floor. Each wing has a defined collaborative area surrounded by classrooms and small-group rooms. Classroom and adjacent spaces are technology-rich with flexible furniture. Transparency of rooms and open hallways provide clear lines of sight enhancing the monitoring and supervision of students.

Designed as a hub rather than a space for lunch, the cafeteria features the school’s orange color and offers high-top tables, moveable furniture, Wi-Fi and charging stations.

The interior color palette, patterns and classical elements such as niches, alcoves and columns provide a sophisticated twist of the 21st-century design flexibility. Color scheme for the middle school is energetic while the high school scheme is calm and sophisticated. Symbolizing the district’s rich history in the arts, an 850-seat performing arts center with oversized proscenium opening evokes a feeling of professional theater. Adjacent to the campus is a new 4,000-seat stadium which features artificial turf football/soccer field and track. Heated lockers rooms, restrooms, and concession stands are located below the stands.

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition