University of Wyoming Breaks Ground for Science Initiative Facility

The University of Wyoming (UW) in Laramie, WY, and state elected officials broke ground recently for a new facility that will enable world-class research and education in pillars of Wyoming’s present and future economy.

University of Wyoming

The Science Initiative facility will contain a 200-seat active-learning classroom, along with state-of-the-art research and laboratory space to support scientific imaging, biological, and greenhouse research. The initiative emphasizes collaboration among multiple disciplines by assembling researchers into a single complex with shared instrumentation, technical support and collaboration spaces.

Through life and data sciences research that impacts areas including mineral extraction, agriculture, tourism, resource management, and high technology, the Science Initiative will have direct economic impact through efficient translation of ideas to the marketplace. Combined with the Tier-1 Engineering Initiative, the Science Initiative’s multidisciplinary research will propel UW into national prominence as a center for economically driven, research-based education in science, engineering, technology and mathematics.

The $100 million project—$85 million from state appropriations, $15 million from UW reserves—is scheduled for completion in early 2021.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition