University of Miami Unveils Plans for On-Campus Residential Village

Florida’s University of Miami (UM) is embarking on the next phase of its multi-tiered plan to transform campus housing into a modern and eclectic mix of sustainable buildings to enhance the student living and academic experience.

Totaling 522,000 square feet, Centennial Village will showcase its lakefront location along Lake Osceola and feature more than 1,700 beds for first-year students, indoor and outdoor spaces for academic and extracurricular activities, a learning hub, meditation room, and apartments for faculty and staff. The village, which will feature four residential colleges and be built in two stages, will sit on the same site as the current Stanford and Hecht Residential Colleges and will reimagine the space fronting Lake Osceola.

University of Miami On-Campus Residential Village

The first stage of Centennial Village will replace Stanford Residential College and is planned to open in the fall of 2022. The second stage, which will replace Hecht Residential College, is slated to open in fall of 2024. In addition, Eaton Residential College will be renovated and incorporated into Centennial Village upon its completion in fall of 2025. The total project cost is estimated at $260 million.

Much like the Student Housing Village, Centennial Village will provide resident students with a living and learning environment that enriches their overall on-campus experience. Like other new construction on UM’s campus, Centennial Village will incorporate facility design and innovative building systems in order to achieve LEED Gold certification.

Design plans for Centennial Village have been submitted to the City of Coral Gables for review, and the university plans to break ground on the project in the summer of 2020.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition